Total Construction of a New Gas Fired Cogeneration Plant Utilizing (3) Cleaver Brooks 150,000#ST/HR Boilers Plus Construction of a New DSI System at Existing Coal Fired Plant
Total Plant Renovation Including, Installation of (2) New Field Erected Gas Fired Package Boilers (2) New Siemens 2.6MW STG’s, 2MW Diesel Generator, and All BOP Mechanical/Electrical/Civil
Installation of (2) New Gas and Oil Fired 90,000# St./Hr. Package Boilers, (1) New 90,000# St./Hr. Coal Fired Field Erected Boiler, and (2) New Deaerators